All
← Back to Squawk list
Collapsed rail bridge causes logistical puzzle to maintain 737 MAX production
Boeing has been forced to look for a solution to continue receiving 737 MAX and P-8 Poseidon fuselages at its factories in Washington after a rail bridge collapsed. The fuselages are transported via rail between Spirit AeroSystems, which manufactures the ‘pickles’, in Wichita, Kansas, and Renton, Washington. However, a key rail bridge over the Yellowstone River collapsed on June 24, 2023, when a train carrying asphalt fell into the river. (www.aerotime.aero) More...Sort type: [Top] [Newest]
Whatever happened to bridge inspections?????
The bridges are inspected and a significant number are failing.
De-regulation.
Huh? That line isn't the only way to get stuff from Wichita to Renton. Sounds like someone has a bad case of octal rectitus.
Nice photo of a pickle being lifted
https://www.ktvq.com/news/local-news/montana-rail-link-moves-boeing-plane-parts-past-derailment-site-to-reed-point
https://www.ktvq.com/news/local-news/montana-rail-link-moves-boeing-plane-parts-past-derailment-site-to-reed-point
Have to call on heavy air transports.